Water, Sewer and Drainage to Serve Merrylands Section 1

VSE provided design, management, and construction phase services for Merrylands Section 1. The work included 330 LF of 4 to 8 inch water line, 6,522 LF of 8 inch sanitary sewer, and 5,938 LF of 24 to 72 inch storm sewer pipe. In addition, a detention pond was included. Construction  complete in 2018 for $4.4M.

1/2